
Article content
OTTAWA — Andrée-Anne Pare is one of the handful of Canadian female construction crane operators on Parliament Hill during the second phase of the estimated $4.5 billion to $5 billion renovation of the buildings.
THIS CONTENT IS RESERVED FOR SUBSCRIBERS
Enjoy the latest local, national and international news.
- Exclusive articles by Conrad Black, Barbara Kay and others. Plus, special edition NP Platformed and First Reading newsletters and virtual events.
- Unlimited online access to National Post.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles including the New York Times Crossword.
- Support local journalism.
SUBSCRIBE FOR MORE ARTICLES
Enjoy the latest local, national and international news.
- Exclusive articles by Conrad Black, Barbara Kay and others. Plus, special edition NP Platformed and First Reading newsletters and virtual events.
- Unlimited online access to National Post.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles including the New York Times Crossword.
- Support local journalism.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account.
- Share your thoughts and join the conversation in the comments.
- Enjoy additional articles per month.
- Get email updates from your favourite authors.
THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account
- Share your thoughts and join the conversation in the comments
- Enjoy additional articles per month
- Get email updates from your favourite authors
Sign In or Create an Account
or
Article content
In this video she tells us of the unique challenges of operating one of the five cranes labouring over Parliament Hill.
Article content
Article content
The first phase of this massive Parliamentary project, the deconstruction, which included both demolition and excavation, is now complete. The second phase, the rebuilding, is currently in progress. This phase is the creation of the new parliamentary welcome centre and upgrades to the historic Centre Block, including restoring all of the heritage elements while modernizing the old structure and its facilities. The third phase, the “fit-out,” has not yet begun, and involves putting in the final finishes and restored heritage elements.
Article content
Advertisement 1
Article content
Main construction will be complete between 2030 and 2031. The Centre Block will reopen about one year later.
Article content
Article content
The video includes some stunning high aerial footage provided to Postmedia by Public Services and Procurement Canada, who for safety reasons don’t allow media to film on their active construction site.
Article content
As of March of this year, up to 800 workers are on site daily (this number will peak at over 1,500). Approximately 95 per cent of the companies that have worked on the project are Canadian owned, with involvement from over 400 companies across eight provinces, including some direct Indigenous participation.
Article content
Crane operators bring home some of the biggest paycheques on big construction sites but that’s partly because they work 10 to 11 hour shifts. Becoming a crane operator requires both in-class study and an apprenticeship. Most programs require a high school diploma (Grade 12), a clean driver’s record, and often a specific commercial driver’s license (like a Class 3 or Class 1 with air brake endorsement) especially for mobile cranes.
Article content
National Post
Article content
Our website is the place for the latest breaking news, exclusive scoops, longreads and provocative commentary. Please bookmark nationalpost.com and sign up for our daily newsletter, Posted, here.
Article content
.png)
4 hours ago
14

















Bengali (BD) ·
English (US) ·