
Article content
Vancouver city council has set aside its planners’ advice and approved, in principle, the Goh Ballet’s plan for a 25-storey student housing tower on Main Street.
THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY
Subscribe now to read the latest news in your city and across Canada.
- Unlimited online access to articles from across Canada with one account.
- Get exclusive access to the Vancouver Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
- Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
- Support local journalists and the next generation of journalists.
- Daily puzzles including the New York Times Crossword.
SUBSCRIBE TO UNLOCK MORE ARTICLES
Subscribe now to read the latest news in your city and across Canada.
- Unlimited online access to articles from across Canada with one account.
- Get exclusive access to the Vancouver Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
- Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
- Support local journalists and the next generation of journalists.
- Daily puzzles including the New York Times Crossword.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account.
- Share your thoughts and join the conversation in the comments.
- Enjoy additional articles per month.
- Get email updates from your favourite authors.
THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account
- Share your thoughts and join the conversation in the comments
- Enjoy additional articles per month
- Get email updates from your favourite authors
Sign In or Create an Account
or
Article content
With an amendment from Coun. Sarah Kirby-Yung, council struck a staff recommendation to send the project back for more work, and instead approved the rezoning application subject to conditions, including a requirement that the 305-student-housing units be owned or leased by a public, post-secondary institution. The project will also require further review and work with city staff before any building can proceed.
Article content
Article content
Article content
City planners had recommended against approving the tower, warning the lot at Main Street and East 8th Avenue is too small to properly hold a building that size — a “conspicuously tall building out of scale with the low-scale Main Street Village context,” the staff report said.
Article content
By signing up you consent to receive the above newsletter from Postmedia Network Inc.
Article content
The rezoning can’t take effect unless council also approves, at a future public hearing, the heritage designation of the century-old former Royal Bank of Canada building on the site.
Article content
The site on Main Street in Mount Pleasant has been for years the two-storey home of the Goh Ballet Academy. The academy has partnered with developer Westbank and is proposing a 25-storey building that would have 315 dormitory-like student housing units, each with a private bathroom and kitchenette. The proposal would also preserve the bank’s century-old heritage facade — but staff said it does on a lot too small to properly hold a tower. Staff recommended council shouldn’t approve the application this week, but instead refer it back to staff to “explore other alternatives to develop the site.”
Article content
Around 10 of the units, on the lower floors, would be set aside for Goh Ballet students, teachers and choreographers.
Article content
Article content

Article content
Coun. Lisa Dominato, who seconded the motion and has long pushed for student housing, said the century-old building no longer works for the academy — describing dancers putting out buckets to catch water dripping through the ceiling. The tower, she said, would give the school a modern home a block from the future Broadway subway line, well-placed for student housing.
Article content
Article content
Coun. Pete Fry repeated some of the staff’s concerns about unit sizes, shadowing, parking and loading, but he voted in support after seeking more clarity from staff about the conditions attached to the approval.
Article content
The site sits in Main Street Village, an area the Broadway plan “generally does not consider rezoning applications” for, staff wrote, “in order to retain the low-rise shopping village character.” The Goh Ballet proposal asked council to make an exception.
Article content
Staff said the lot is too small for a tower. Its frontage of about 19 metres is less than half the 46 metres the Broadway plan requires, the site has no rear lane and the design leaves no room for the setbacks that let neighbouring properties redevelop. Without assembling adjacent lots, staff said they could support only a six-storey building.
.png)
1 hour ago
8

















Bengali (BD) ·
English (US) ·