King St. W. traffic congestion expected as watermains replaced, streetcar tracks renewed

3 hours ago 8

The construction will begin in November

Published Sep 17, 2026  •  2 minute read

Construction mapWatermain and streetcar track work will begin on King St. west between Dufferin St. West and Close Ave. in November Photo by toronto.ca

See more Toronto Sun on Google — save as a Preferred Source

Advertisement 2

Toronto Sun

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account.
  • Get exclusive access to the Toronto Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account.
  • Get exclusive access to the Toronto Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account
  • Share your thoughts and join the conversation in the comments
  • Enjoy additional articles per month
  • Get email updates from your favourite authors

Article content

The City of Toronto and the TTC are slated to do both watermain replacement and streetcar track renewal on a portion of King St. W. starting in November.

Article content

Article content

And that means more traffic disruptions.

The construction, which won’t be finished until next August, will occur between Dufferin St. and Close Ave., one block east of Jameson Ave.

During construction, 504 King streetcars will operate as a single branch between Dundas West Station and Broadview Station, and 304/504 King streetcars will divert via Queen St. W. between Roncesvalles Ave. and Spadina Ave.

Major works impacting the TTC’s King streetcar route. Major works impacting the TTC’s King streetcar route. Toronto Sun

To maintain service on King St W., 504C/304C King replacement buses will operate between the Distillery District and Roncesvalles Ave., and 503 Kingston Rd. buses will be extended west to Dufferin Gate Loop via King St. W.

The 508 Lake Shore streetcars will be suspended during this period, but Wheel-Trans service will continue to operate normally and will not be affected by the construction.

“Road users should expect delays and increased traffic on nearby main and side streets during this work,” said the city in its pre-construction notice.

Advertisement 3

Article content

Twin watermains almost 140 years old

Along with renewing aging streetcar tracks along the route, the city will also replace the 139-year-old twin watermains that run on both the north and south side of King St. W.

This work is required to bring the track infrastructure to a state of good repair, improve water distribution and reduce the risk of watermain breaks, the city said.

Planned TTC service changes. Planned TTC service changes. Toronto Sun

The watermain work will take place between 7 a.m. and 7 p.m., Monday to Friday, with late work or weekend work when needed. Track replacement work will take place 24 hours a day, seven days per week.

Around-the-clock work during rail installation by TTC is required to preserve the integrity and quality of new rail and concrete.

Overnight rail work by TTC may consist of moving new rail into position, rail installation and rail welding/grinding, the city added.

Read More

  1. The TTC recently installed subway platform barriers at TMU Station.

    Brad Bradford rips safety barriers installed at TTC’s TMU Station

  2. TTC streetcar along Dundas St. W. in Toronto. The TTC begins its new fare cap system on Sept. 1.

    TTC rolls out fare cap system

Article content

*** Disclaimer: This Article is auto-aggregated by a Rss Api Program and has not been created or edited by Bdtype.

(Note: This is an unedited and auto-generated story from Syndicated News Rss Api. News.bdtype.com Staff may not have modified or edited the content body.

Please visit the Source Website that deserves the credit and responsibility for creating this content.)

Watch Live | Source Article