The construction will begin in November
Published Sep 17, 2026 • 2 minute read

See more Toronto Sun on Google — save as a Preferred Source
Advertisement 2
THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY
Subscribe now to read the latest news in your city and across Canada.
- Unlimited online access to articles from across Canada with one account.
- Get exclusive access to the Toronto Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
- Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
- Support local journalists and the next generation of journalists.
- Daily puzzles including the New York Times Crossword.
SUBSCRIBE TO UNLOCK MORE ARTICLES
Subscribe now to read the latest news in your city and across Canada.
- Unlimited online access to articles from across Canada with one account.
- Get exclusive access to the Toronto Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
- Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
- Support local journalists and the next generation of journalists.
- Daily puzzles including the New York Times Crossword.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account.
- Share your thoughts and join the conversation in the comments.
- Enjoy additional articles per month.
- Get email updates from your favourite authors.
THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account
- Share your thoughts and join the conversation in the comments
- Enjoy additional articles per month
- Get email updates from your favourite authors
Article content
The City of Toronto and the TTC are slated to do both watermain replacement and streetcar track renewal on a portion of King St. W. starting in November.
Article content
Article content
And that means more traffic disruptions.
The construction, which won’t be finished until next August, will occur between Dufferin St. and Close Ave., one block east of Jameson Ave.
During construction, 504 King streetcars will operate as a single branch between Dundas West Station and Broadview Station, and 304/504 King streetcars will divert via Queen St. W. between Roncesvalles Ave. and Spadina Ave.

To maintain service on King St W., 504C/304C King replacement buses will operate between the Distillery District and Roncesvalles Ave., and 503 Kingston Rd. buses will be extended west to Dufferin Gate Loop via King St. W.
The 508 Lake Shore streetcars will be suspended during this period, but Wheel-Trans service will continue to operate normally and will not be affected by the construction.
“Road users should expect delays and increased traffic on nearby main and side streets during this work,” said the city in its pre-construction notice.
Advertisement 3
Article content
Twin watermains almost 140 years old
Along with renewing aging streetcar tracks along the route, the city will also replace the 139-year-old twin watermains that run on both the north and south side of King St. W.
This work is required to bring the track infrastructure to a state of good repair, improve water distribution and reduce the risk of watermain breaks, the city said.

The watermain work will take place between 7 a.m. and 7 p.m., Monday to Friday, with late work or weekend work when needed. Track replacement work will take place 24 hours a day, seven days per week.
Around-the-clock work during rail installation by TTC is required to preserve the integrity and quality of new rail and concrete.
Overnight rail work by TTC may consist of moving new rail into position, rail installation and rail welding/grinding, the city added.
Read More
Article content
.png)
3 hours ago
8


















Bengali (BD) ·
English (US) ·