Glacier illness sends floods implicit Nepal-China border, sidesplitting astatine slightest 270 and leaving much than 1,300 missing.
![A drone presumption shows mud covering buildings and spot pursuing devastating floods astatine Trishuli successful Nuwakot district, Nepal, connected August 27, 2026. [Navesh Chitrakar/Reuters]](https://www.aljazeera.com/wp-content/uploads/2026/08/2026-08-27T040700Z_1429273603_RC2S6NAJGSBE_RTRMADP_3_NEPAL-FLOODS-1787811133.jpg?resize=770%2C513&quality=80)
By AFP
,
AP
,
EPA
and
Reuters
Published On 27 Aug 2026
Rescue teams are searching for hundreds of missing radical connected the borderline betwixt Nepal and China aft a catastrophic torrent of floodwater and mud swept done respective communities pursuing a glacier illness the erstwhile day.
The catastrophe has near astatine slightest 270 radical dormant and much than 1,300 missing, including foreigners and pilgrims. Hundreds of others are displaced crossed the Himalayan region, authorities said.
Nepali officials accidental hunt efforts are being analyzable due to the fact that dozens of bridges person been destroyed and harm to astir 40km (25 miles) of roads.
Nepali service chopper operations rescued much than 100 radical from flood-affected areas connected Thursday, said service spokesman, Brigadier General Raja Ram Basnet.
At slightest 8 overseas nationals were airlifted to the capital, Kathmandu, and service teams evacuated radical trapped successful facilities linked to the Trishuli hydropower project, helium added.
Rescuers recovered bodies astir 100 kilometres (60 miles) downstream from the catastrophe portion successful Chitwan district. Dozens of injured radical person been transported to Kathmandu for precocious aesculapian care.
The absorption has shifted from rescue to large-scale alleviation operations successful flood-hit districts, said Bishal Kumar Bhandari, chairperson of the Nepal Red Cross Society. About 1,200 radical person been displaced from astatine slightest 3 villages, helium added.
In Tibet, a mudslide adjacent the onshore borderline crossing astatine Gyirong connected Wednesday near surrounding areas covered successful mud much than 1.5 metres (5 feet) heavy connected average, with immoderate sections of roadworthy exceeding 2 metres (6 feet), reported the Chinese authorities broadcaster CCTV.












.png)
5 hours ago
6
















Bengali (BD) ·
English (US) ·