‘Miracle’ rescue 9 days aft devastating flood raises anticipation that much radical could inactive beryllium recovered alive.
Published On 4 Sep 2026
Search teams person rescued 2 men from a hydropower passageway buried by debris during the flash flood that devastated Nepal 9 days ago.
The 2 workers were pulled live from the main passageway astatine the operation tract of the Trishuli 3A works aboriginal connected Friday. The rescue raises anticipation of recovering much of the hundreds of radical believed to stay trapped successful hydropower tunnels.
Recommended Stories
list of 3 items- list 1 of 3Nepal hunt operations proceed a week aft catastrophic floods
- list 2 of 3Photos: Symbolic funerals held successful Nepal for missing flood victims
- list 3 of 3Rescue efforts proceed arsenic Nepal-China flood decease toll rises to 1,280
The cascade, believed to person been triggered by the partial collapse of a glacier, killed much than 1,200 radical and devastated full communities, arsenic water, stone and mud raced down Himalayan valleys.
A video released by Nepal’s Ministry of Energy showed cheering arsenic a antheral emerged done a tiny muddy opening. He was helped to his feet by rescuers and carried connected the backs of exigency workers, raising his manus arsenic they took him towards a helicopter.
A 2nd antheral covered successful mud pressed his hands unneurotic successful supplication arsenic helium was carried distant connected a stretcher.
Nepal’s service unit transportation a idiosyncratic who was trapped wrong a tunnel, during a rescue cognition astatine Trishuli-3A Hydropower Project successful Nepal’s Rasuwa territory [AFP]The rescued men were identified arsenic Sanjay Shah, 30, a mechanical foreman, and Kabir Maharjan, 45, a mechanical supervisor, by the curate of location affairs of Nepal, Sudan Gurung.
“I americium truthful happy, my bosom is lighter,” Maharjan’s member Amir told the AFP quality agency.
The Nepali Army said the 2 men were receiving aesculapian attraction and would beryllium taken to a infirmary successful Kathmandu, portion “search and rescue operations are ongoing.”
The brace are the archetypal to beryllium rescued from hydropower stations oregon operation projects successful Nepal. At slightest 557 workers are missing from the Trishuli 3A project. About 115 are believed to person been trapped successful the main tunnel.
An service spokesperson reported that 1 of the survivors had told rescuers much radical stay live wrong the tunnel.
Nepal’s Communication Minister Bikram Timilsina said officials stay hopeful that much workers volition beryllium rescued. “We are waiting for the rescue of much and much people,” helium wrote connected societal media.
Rescuers person been desperately seeking survivors aft the catastrophe connected August 26 near much than 5,000 radical missing successful Nepal and Chinese-controlled Tibet.
Nepal has mostly refused planetary help. However, Australia sent a squad of drone specialists to the state connected Friday.
The 15-member team, predominantly consisting of authorities exigency operatives, is joining the rescue operations connected the petition of Nepal’s government, authorities said. Thirty-six Australian citizens stay missing.
“We are inactive holding retired anticipation that radical mightiness inactive beryllium surviving successful immoderate benignant of locations and hopefully this squad tin assistance find immoderate of those people,” Jeremy Fewtrell, the commissioner of Fire and Rescue New South Wales, told reporters astatine Sydney Airport.
At slightest 1,287 radical person been confirmed to person been killed successful the catastrophe successful Nepal, and tens of thousands displaced. China has said 21 radical were killed and 541 were missing connected the Tibet side.
.png)
1 hour ago
7



















Bengali (BD) ·
English (US) ·