Major construction work coming to King Street West

2 hours ago 9

Watermain replacement and TTC track repairs set for downtown corridor until end of 2027

Published Nov 20, 2026  •  Last updated 16 minutes ago  •  2 minute read

TTC track and watermain replacement is coming to King St. W.TTC track and watermain replacement is coming to King St. W. Photo by Jack Boland / Files /Toronto Sun

See more Toronto Sun on Google — save as a Preferred Source

Advertisement 2

Toronto Sun

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account.
  • Get exclusive access to the Toronto Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account.
  • Get exclusive access to the Toronto Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account
  • Share your thoughts and join the conversation in the comments
  • Enjoy additional articles per month
  • Get email updates from your favourite authors

Article content

Sections of King St. W. will be torn up for major construction work beginning next week.

Article content

Article content

And the City of Toronto says the infrastructure improvements along the downtown corridor will continue throughout 2027.

“This work is part of a multi-year infrastructure renewal program between the City and TTC that began in 2020 to replace aging watermain infrastructure and renew streetcar tracks along the King Street corridor with co-ordinated timing and sequencing to help reduce future disruptions and support Toronto’s long-term infrastructure needs,” the city said in a news release Friday morning.

There will be temporary traffic restrictions, lane reductions and intersection closures over the course of repairs.

“Construction will be completed in phases to help minimize disruptions while critical watermain and streetcar infrastructure is renewed,” the city said.

RECOMMENDED VIDEO

Loading...

We apologize, but this video has failed to load.

Crews get to work Monday

Work will begin between Dufferin St. and Close Ave. on Monday and continue until next fall. There could be intermittent intersection closures during watermain replacement work, the city said.

Advertisement 3

Article content

Construction will then commence on the stretch of road between Spadina Ave. and Portland St. as early as December, which will wrap up some time next summer.

In the spring, the section between Bathurst St. and Shaw St. will be under construction until later in the year. Crews will also be busy at the York St. intersection until the following summer.

Next fall, the portion of King St. W. between Charlotte St. and University Ave. will be under construction until the winter.

Read More

  1. Signage alerting residents to the coyotes in the area on bridges linking the Fort York to the Garrison Park/Stanley Park after dogs were attacked, on Tuesday April 29, 2025.

    Coyote bites, drags child at Toronto’s Edwards Gardens

  2. The Royal Ontario Museum (ROM) located at Bloor Street West and Queens Park, Wednesday January 14, 2026.

    Toronto attraction makes Top 10 of North America’s best list

Traffic monitored during construction

The city said traffic will be monitored and several measures will be put in place so that people and goods can move through the area during the disruptions, including traffic signal adjustments, traffic control personnel and construction signage.

Sidewalks and pedestrian routes will be maintained as well as access to businesses and properties throughout the construction work.

There will also be temporary TTC route diversions and service adjustments, the city said.

During the first two phases of the project, one lane of traffic in each direction will be open during watermain replacement work. For streetcar track repairs, only one lane of traffic will remain open in one direction through the work zone.

Detailed TTC route diversions during construction can be found at ttc.ca.

Article content

*** Disclaimer: This Article is auto-aggregated by a Rss Api Program and has not been created or edited by Bdtype.

(Note: This is an unedited and auto-generated story from Syndicated News Rss Api. News.bdtype.com Staff may not have modified or edited the content body.

Please visit the Source Website that deserves the credit and responsibility for creating this content.)

Watch Live | Source Article